Answer (Choose 1 answer)
You should control every step of the pre-opening because
A. Mostly to adapt to possible material changes.
B. Mostly because this operation has a cost.
C. Mostly to find out creative ways of making things happen that have a positive impact on the operation.
D. All of the above