Answer (Choose 1 answer)
☐ C
☐ D
ΠΕ
What is the RTO?
A. The time when a system or function must be recovered.
B. The maximum amount of time a system or service can be down before affecting the organization's
mission.
C. The contingency planning of an organization.
D. The time until start conducting system recovery.
E. None of the other choices
Back
Next
the exam.
Ext