IAA202_-_SU_2024_-_FE_2310.webp
K

IAA202_-_SU_2024_-_FE_2310.webp

Kizspy | Question: 9
(Choose 1 answer)
A business impact analysis (BIA) includes a maximum acceptable outage (MAO). The MAO is used to determine the amount of time in which a system must be recovered. What term is used in the DRP instead of the MAO?
A. Critical business function (CBF)
B. DRP action item (DRPAI)
C. Recovery action item (RAI)
D. Recovery time objective (RTO)

Thông tin

Category
IAA202
Thêm bởi
Kurourushi2000
Ngày thêm
Lượt xem
1,297
Lượt bình luận
5
Rating
0.00 star(s) 0 đánh giá

Share this media

Back
Bên trên Bottom