(Choose 1 answer)
(See picture)
A. 1.440
B. 8.816
C. 0.040451
D. 3.962
Error
Total
Predictor
14 15 11.912
33.409
Coef
StdError
t Stat
P-value
Intercept 3.962
1.440
2.75
0.016
Industry 0.040451
0.008048
5.03
0.000
Durbin-Watson Statistic
0.801
1.59
The prediction of Y for a quarter in which X = 120 is
hish
Exit 3