(Choose 1 answer)
To conduct a pilot project, we can apply one of the following ways, except:
A. Reduce the cost of the original plan
B. Reduce the breadth of the program
C. Reduce the timing of the program
D. Reduce the scope of the original plan
vat fini
Finish
Exll