(Choose 3 answers)
Which of the following methods assist is developing a pilot project? Choose all that apply.
A. Reduce the timing of the program.
B. Reduce the scope of the original plan.
C. Reduce the breadth or reach of the program.
D. Increase the budget of your original plan.
Finish
22