OSG202_-_C1_-_FE_-_SU_2023_463.webp
Pride20031

OSG202_-_C1_-_FE_-_SU_2023_463.webp

(Choose 1 answer)
Five batch jobs A through E, arrive at a computer center at almost the same time. They have running times of 8, 6, 2, 10, and 4 minutes. Determine the average waiting time for SJF (Shoscheduling. Ignore process switching overhead.
A. 14 minutes
B. 8 minutes
C. 6 minutes
D. 18.8 minutes
Save at server failed!. Please inform the supervisor and continue the exam.
El (24)

Thông tin

Category
OSG202
Thêm bởi
Pride20031
Ngày thêm
Lượt xem
3,329
Lượt bình luận
17
Rating
0.00 star(s) 0 đánh giá

Image metadata

Filename
OSG202_-_C1_-_FE_-_SU_2023_463.webp
File size
49 KB
Dimensions
1372px x 594px

Share this media

Back
Bên trên Bottom