(Choose 1 answer)
You are building an apartment complex with four, 10,000 square foot buildings based on the same drawings you used in another city two years ago. What is the danger of estimating using the same parametric model of $50 per square foot?
A. It will take much more time than a bottoms up estimating.
B. It's not very easy to scale.
C. Historical cost relationships may no longer be applicable.
D. The technical design is unstable.
Exit 39