Question: 29
(Choose 1 answer)
A CBA has been performed on a prospective control. The CBA indicates the cost of the control is about the
same as the control's projected benefits. What should be done?
A. Identify the ROI
B. Purchase the control
C. Cancel the purchase of the control
D. Redo the CBA