• Integration with public transport management systems.
• Integration with railway infrastructure management systems.
Since this is a high-speed train control system, it requires very high quality. The probability of system failure must be less than 0.000001. The requirements and design of the system need to be analyzed, specified, and thoroughly tested before being put into development. The system requires compliance with stringent safety standards in the transportation sector. It also requires real-time processing and must be highly modular in design for easy enhancement and modification. Graphical interface modules must comply with local cultural standards.
The SSC project is a new development system project and have many external stakeholders. With the experienced resources of the JRC's Software Development (SD) department, the JRC's Board of Directors (BOD) intended that the project will be undertaken by the SD department. In the BOD's meeting, managers of other JRC's departments commit to sending employees to support the project but they could not daily work with the development team due to heavy workload of operating tasks. The new version of Shinkansen is the company's strategic product, so the company must have this product in the market in the next year. Therefore, JRC's leadership expects the full version of the SSC system must be completed within 12 months.
It is assumed that you are assigned to implement this project, you should read carefully the above description of the project then answer these questions:
1. Your team members have much experienced but they are much specialized in development works. Your manager tell you that the XP process should be used for the project. Do you agree or not agree with him/her? Base on the provided project characteristics (user,customer, team, requirements characteristics, time constraints and managers'expectation), please give your assessment to support for your answer (2.0 points).
2. What type and level/stage of testing should you do to meet customer's requirements? Who will do test in each test level/stage? (1.0 point)71
100%
ANSWER SHEET
SECTION 1 (Questions 1-1)
1)
Full Screen
Auto Save every minute
1
Undo
Redo
Chưa có bình luận nào.

Thông tin

Category
SWE201c
Thêm bởi
happy_smile
Ngày thêm
Lượt xem
8,836
Lượt bình luận
0
Rating
0.00 star(s) 0 đánh giá

Share this media

Back
Bên trên Bottom