(Choose 1 answer)
Which statement is TRUE about Old Fashioned cocktail? (Choose 01 answer)
A. The Old Fashioned is a cocktail that is NEVER served in a cocktail glass.
B. The Old Fashioned is a cocktail that is ALWAYS served in a cocktail glass.
C. The Old Fashioned is a cocktail that is OFTEN served in a cocktail glass.
D. None of the above