(Choose 1 answer)
Most drinks contain one jigger of the major ingredient, and
(Choose 01 answer)
A. the jigger size is not a policy decision of the management
B. the jigger size is the same everywhere
C. the jigger size is always different
D. the jigger size is a policy decision of the management