OSG202_-_SP_2024_-_FE_1656.webp
Kokushibo91

OSG202_-_SP_2024_-_FE_1656.webp

(Choose 1 answer)
Five batch jobs A through E, arrive at a computer center at almost the same time. They have estimated running times of 8, 6, 2, 10, and 4 minutes. Their (externally determined) priorities are 3, 5, 2, 1, and 4,respectively, with 5 being the highest priority. Determine the average waiting time for Priority scheduling. Ignore process switching overhead.
A. 10,8 minutes
B. 12,8 minutes
C. 16,8 minutes
D. 54 minutes


Q: 45

Thông tin

Category
OSG202
Thêm bởi
Kokushibo91
Ngày thêm
Lượt xem
4,894
Lượt bình luận
23
Rating
0.00 star(s) 0 đánh giá

Image metadata

Filename
OSG202_-_SP_2024_-_FE_1656.webp
File size
192.4 KB
Dimensions
1920px x 892px

Share this media

Back
Bên trên Bottom