☑Kizspy.me
(Choose 1 answer)
☐ A
☐ E
Which of the following is the main purpose of the integration strategy for
integration testing in the small?
A. To ensure that all of the small modules are tested adequately
B. To ensure that the system interfaces to other systems and networks
C. To specify which modules to combine when and how many at once
D. To ensure that the integration testing can be performed by a small team
E. To specify how the software should be divided into modules
Back
Next
FUO.sh
sh the exam.