☑Kizspy.me
(Choose 1 answer)
☐ A
Back
Next
FUO.ǝh
sh the exam.
Test planning has which of the following major tasks?
i. Determining the scope and risks, and identifying the objectives of testing.
ii. Determining the test approach (techniques, test items, coverage, identifying and interfacing the teams
involved in testing, testware)
iii. Reviewing the Test Basis (such as requirements, architecture, design, interface)
iv. Determining the exit criteria.
A. i,ii,iv are true and iii is false
B. i,,iv are true and ii is false
C. i,ii are true and iii,iv are false
D. ii,ii,iv are true and i is false